Our main office and workshop is currently based at Noble Square Industrial Estate in Brynmawr, NP23 4BS, just off the A465 Heads of the Valleys Road. We currently have site teams working throughout the U.K. on some high profile engineering projects for major clients.
Current + Completed Site projects
Site welding of 5 number Bridges at Ordsall Chord Manchester for Severfield U.K.
Site welding and painting of Structural steelwork on West and East ticket Halls Farringdon and Paddington stations London for Bourne Steel Ltd.
Site welding of Structural steelwork at Principal Place London for Clarey’s.
Site welding on Knostrop Bridge in Leeds for S.H.Structures.
Site fabrication and welding on Hinkley Jetty in Avonmouth for Costains.
Regular supply of skilled labour (Fabricators & Welders) to Severfield U.K. at their factories in Bolton and Dalton.
Supply fabrication and site welding of Fender Brackets and Quay Side steelwork at Hull for Graham’s / Lagan’s.
Site fabrication and welding on Bond Street London for Mabey Bridge Ltd.
Site welding of S14 Footbridge on the A465 Heads of Valleys project for Briton Fabricators.
Site welding on Featherbed Lane Rail Bridge for Allerton Steel Ltd.
Site welding on Newport Rail Bridge Street for Cleveland Bridge Ltd.
Fabrication of 30m trusses on the Big-Ben temporary works project in London for Apex Ltd.
Fabrication of various steelwork components on the new Tottenham Hotspur stadium for Severfield U.K.
Fabrication of 20 tonne rakers on the L.D.P. project in London for Severfield U.K.
Code serve carry a fully qualified workforce and has attained execution level 4 for manufacture (including welding) of structural steelwork along with ISO 9001 Quality System. We have a vast library of welding procedures (with Sandberg’s third party approval) and WPQR’s to cover a full range of steel grades, positions and joint configurations. All our welders are qualified to these procedures.
We supply all of our own fully maintained and calibrated welding plant for site work which complies with all current legislation. We also carry our own in-house N.D.T. team which enables us to issue a full quality package on completion of project.
The site welding, fabrication and protective treatment content on the above projects is going very well and we have received excellent comments from the various clients and site teams. We have proven our capabilities in relation to completion of shop and site fabrication projects to a high standard in both safety and quality along with delivery on time.
The current workshop facility circa 40,000 sq feet under cover turns over approximately 400t per month with a current workforce of circa 25 factory based and 30 – 40 on various sites throughout the U.K.
The factory has eight O/H cranes up to 45t with the capacity to tandem lift and carry 85t in two of the bays. We are currently in the process of in-stalling an Oxy-fuel / plasma profiler to complement the existing fabrication facility.